Ocotillo Wind Energy Facility Project
CACA-51552

Environmental and Construction Compliance Monitoring Program

NOTE: This website is hosted by Dudek and is not an official BLM website. Linked files presented on this page are in PDF format. To view them, you will need to download the free Adobe Acrobat Reader if it is not already installed on your computer. For faster results in displaying the larger files, right-click the file's link, click "Save Target As" to download the file to your hard drive, then double-click the downloaded file.


Pre-Construction Reports, Permits, and Other Documents

Project reports prepared during project planning and design are provided below. Note that due to timing of finalizing the reports, not all reports reflect the final design layout. Implementation of each of the plans during and following construction entails an adaptive approach to allow for implementation to adjust to the site conditions and specific requirements. Confidential information has been redacted from the pre-construction reports, permits and other documents.

Dust Control Plan
BEI, 5/1/12; compliance with Mitigation Measure Air-1

Control Unauthorized Access
OE LLC, 5/1/12; compliance with Mitigation Measure Cul-11

Construction Fire Safety Plan
BEI, 5/15/12; compliance with Mitigation Measure Fire-1

Paleontological Monitoring and Treatment Plan
San Diego Natural History Museum, 8/13/12; compliance with Mitigation Measure Paleo-1

Construction Emergency Response Plan
BEI, 4/12; compliance with Mitigation Measure PHS-8

Construction Waste Management Plan
BEI, 4/12; compliance with Mitigation Measure PHS-9

Construction Traffic Management Plan
BEI, 4/12; compliance with POD-14 and POD-15

Integrated Weed Management Plan
Helix, 2/17/12; compliance with Mitigation Measure Veg-1d

Off-site Habitat Restoration Plan
Helix, 5/21/12; compliance with Mitigation Measure Veg-2a, 3

Habitat Revegetation Plan
Helix, 4/30/12; compliance with Mitigation Measure Veg-2b

Construction and Operational Lighting Mitigation Plan
BEI, 4/12; compliance with Mitigation Measure VR-2.

Surface Treatment Plan - Substation
BEI, 4/12; compliance with Mitigation Measure VR-3.

Surface Treatment Plan - O&M Facility
BEI, 9/12; compliance with Mitigation Measure VR-3

Screening Plan - Substation
BEI, 5/12; compliance with Mitigation Measure VR-4.

Screening Plan - O&M Facility
BEI, 9/12; compliance with Mitigation Measure VR-4

Raven Control Plan
Helix, 4/30/12; compliance with Mitigation Measure Wild-1j

Golden Eagle Conservation Plan
OE LLC, 2/23/12; compliance with Mitigation Measure Wild-1o

Avian and Bat Protection Plan
Ocotillo Express LLC, 2/1/12; compliance with Mitigation Measure Wild-1p

Burrowing Owl Mitigation and Monitoring Plan
Helix, 5/3/12; compliance with Mitigation Measure Wild-1n, 2a

Peninsular Bighorn Sheep Mitigation and Monitoring Plan
Helix, 5/3/12; compliance with Mitigation Measure Wild-1s

Nesting Bird Mitigation and Monitoring Plan
Helix, 5/1/12; compliance with Mitigation Measure Wild-2b

Streambed Alteration Agreement
CDFG, compliance with Mitigation Measure Water-1

RWQCB 401 Water Quality Certification
RWQCB, 5/1/12; compliance with Mitigation Measure Water-1

Water Supply Contingency Plan
BEI, 4/12; compliance with Mitigation Measure Water-2

Drought Water Management Plan & Conservation Education Program
BEI, 9/26/11; compliance with Mitigation Measure Water-7

Storm Water Pollution Prevention Plan (SWPPP)
BEI, 4/6/12; compliance with Mitigation Measure Water-9

Spill Prevention, Control and Countermeasure (SPPC) Plan
BEI, 5/3/12; compliance with Mitigation Measure Water-10